Hello, 

We are working on a project where we want to gather information about the job performance across different task level parallelism settings.
Essentially, we want to see how the throughput of a single task varies across different parallelism settings, e.g. for a job of 5 tasks: 1-1-1-1-1 vs. 1-2-1-1-1 vs. 2-2-2-2-2. 

We are running flink on Kubernetes, a job with 5 tasks, slot sharing is enabled, operator chasing is disabled and each task manager has one slot.

So, the number of task managers is always the number of the highest parallelism and wen can fit the entire job into one task manager slot. 

We are then running the job against multiple parallelism configs (such as those above), collect the relevant metrics and try to get some useful information out of them. 

We are now wondering how independent our results are from one another. More specifically, if we now look at the parallelism of the second task, is its performance independent of the parallelism of the other tasks? So, will a the second task perform the same in (1-2-1-1-1) as in (2-2-2-2-2)? 

Our take on it is the following: With our setup, (1-2-1-1-1) should result in one task manager holding the entire job and a second task manager that only runs the second task. (2-2-2-2-2) will run two task managers with the entire job. So, theoretically, the second task should have much more resources available in the first setup as it has the entire resources of that task manager to its disposal. Does that assumption hold or will flink assign a certain amount of resources to a task in a task manager no matter how many other tasks are running on that same task manager slot? 

We would highly appreciate any help. 

Best, 
Jan
Reply | Threaded
Open this post in threaded view
|

Re: Independence of task parallelism

Piotr Nowojski-4
Hi Jan,

As far as I remember, Flink doesn't handle very well cases like (1-2-1-1-1) and two Task Managers. There are no guarantees how the operators/subtasks are going to be scheduled, but most likely it will be as you mentioned/observed. First task manager will be handling all of the operators, while the second task manager will only be running a single instance of the second operator (for load balancing reasons it would be better to spread the tasks across those two Task Managers more evenly).

No, Flink doesn't hold any resources (appart of network buffers) per task. All of the available memory and CPU resources are shared across all of the running tasks. So in the (1-2-1-1-1) case, if the first task manager will be overloaded (for example if it has very few CPU cores), the second task will perform much better on the second task manager (which will be empty), causing a throughput skew. From this perspective, (2-2-2-2-2) would most likely be performing better, as the load would be more evenly spread.  

Piotrek 

niedz., 28 lut 2021 o 13:10 Jan Nitschke <[hidden email]> napisał(a):
Hello, 

We are working on a project where we want to gather information about the job performance across different task level parallelism settings.
Essentially, we want to see how the throughput of a single task varies across different parallelism settings, e.g. for a job of 5 tasks: 1-1-1-1-1 vs. 1-2-1-1-1 vs. 2-2-2-2-2. 

We are running flink on Kubernetes, a job with 5 tasks, slot sharing is enabled, operator chasing is disabled and each task manager has one slot.

So, the number of task managers is always the number of the highest parallelism and wen can fit the entire job into one task manager slot. 

We are then running the job against multiple parallelism configs (such as those above), collect the relevant metrics and try to get some useful information out of them. 

We are now wondering how independent our results are from one another. More specifically, if we now look at the parallelism of the second task, is its performance independent of the parallelism of the other tasks? So, will a the second task perform the same in (1-2-1-1-1) as in (2-2-2-2-2)? 

Our take on it is the following: With our setup, (1-2-1-1-1) should result in one task manager holding the entire job and a second task manager that only runs the second task. (2-2-2-2-2) will run two task managers with the entire job. So, theoretically, the second task should have much more resources available in the first setup as it has the entire resources of that task manager to its disposal. Does that assumption hold or will flink assign a certain amount of resources to a task in a task manager no matter how many other tasks are running on that same task manager slot? 

We would highly appreciate any help. 

Best, 
Jan
Reply | Threaded
Open this post in threaded view
|

Aw: Re: Independence of task parallelism

Jan Nitschke
Hey Piotr, 
 
thanks for your answer, that makes perfect sense. However, when looking at the number of messages being processed, we can see that both subtasks on task 2 will produce the same amount of messages in the (1-2-1-1-1) scenario, even with the first task hitting backpressure. We assume that this has to do with the distribution of messages between task. As messages are being distributed equally among subtasks in our case, would this be an explanation for that behavior?
 
Best, 
Jan
 
 
Gesendet: Mittwoch, 03. März 2021 um 19:53 Uhr
Von: "Piotr Nowojski" <[hidden email]>
An: "Jan Nitschke" <[hidden email]>
Cc: "user" <[hidden email]>
Betreff: Re: Independence of task parallelism
Hi Jan,
 
As far as I remember, Flink doesn't handle very well cases like (1-2-1-1-1) and two Task Managers. There are no guarantees how the operators/subtasks are going to be scheduled, but most likely it will be as you mentioned/observed. First task manager will be handling all of the operators, while the second task manager will only be running a single instance of the second operator (for load balancing reasons it would be better to spread the tasks across those two Task Managers more evenly).
 
No, Flink doesn't hold any resources (appart of network buffers) per task. All of the available memory and CPU resources are shared across all of the running tasks. So in the (1-2-1-1-1) case, if the first task manager will be overloaded (for example if it has very few CPU cores), the second task will perform much better on the second task manager (which will be empty), causing a throughput skew. From this perspective, (2-2-2-2-2) would most likely be performing better, as the load would be more evenly spread.  
 
Piotrek 
 
niedz., 28 lut 2021 o 13:10 Jan Nitschke <[hidden email]> napisał(a):
Hello, 
 
We are working on a project where we want to gather information about the job performance across different task level parallelism settings.
Essentially, we want to see how the throughput of a single task varies across different parallelism settings, e.g. for a job of 5 tasks: 1-1-1-1-1 vs. 1-2-1-1-1 vs. 2-2-2-2-2. 
 
We are running flink on Kubernetes, a job with 5 tasks, slot sharing is enabled, operator chasing is disabled and each task manager has one slot.
 
So, the number of task managers is always the number of the highest parallelism and wen can fit the entire job into one task manager slot. 
 
We are then running the job against multiple parallelism configs (such as those above), collect the relevant metrics and try to get some useful information out of them. 
 
We are now wondering how independent our results are from one another. More specifically, if we now look at the parallelism of the second task, is its performance independent of the parallelism of the other tasks? So, will a the second task perform the same in (1-2-1-1-1) as in (2-2-2-2-2)? 
 
Our take on it is the following: With our setup, (1-2-1-1-1) should result in one task manager holding the entire job and a second task manager that only runs the second task. (2-2-2-2-2) will run two task managers with the entire job. So, theoretically, the second task should have much more resources available in the first setup as it has the entire resources of that task manager to its disposal. Does that assumption hold or will flink assign a certain amount of resources to a task in a task manager no matter how many other tasks are running on that same task manager slot? 
 
We would highly appreciate any help. 
 
Best, 
Jan
Reply | Threaded
Open this post in threaded view
|

Re: Re: Independence of task parallelism

Piotr Nowojski-4
Yes, it might be the case. Hard to tell for sure without looking at the job, metrics etc. Just be mindful of what I described, and if you want to fine tune a job and set different parallelism values for different operators, pay attention to where those operators are being distributed. Usually in practice there is little reason to choose (1-2-1-1-1) over (2-2-2-2-2). If you spread a load of some operators more than you need? Usually not an issue. On the other hand with (2-2-2-2-2) you will spread the load more evenly across task managers, which makes it easier to tune/analyse/optimise. 

Best,
Piotrek

pt., 5 mar 2021 o 09:10 Jan Nitschke <[hidden email]> napisał(a):
Hey Piotr, 
 
thanks for your answer, that makes perfect sense. However, when looking at the number of messages being processed, we can see that both subtasks on task 2 will produce the same amount of messages in the (1-2-1-1-1) scenario, even with the first task hitting backpressure. We assume that this has to do with the distribution of messages between task. As messages are being distributed equally among subtasks in our case, would this be an explanation for that behavior?
 
Best, 
Jan
 
 
Gesendet: Mittwoch, 03. März 2021 um 19:53 Uhr
Von: "Piotr Nowojski" <[hidden email]>
An: "Jan Nitschke" <[hidden email]>
Cc: "user" <[hidden email]>
Betreff: Re: Independence of task parallelism
Hi Jan,
 
As far as I remember, Flink doesn't handle very well cases like (1-2-1-1-1) and two Task Managers. There are no guarantees how the operators/subtasks are going to be scheduled, but most likely it will be as you mentioned/observed. First task manager will be handling all of the operators, while the second task manager will only be running a single instance of the second operator (for load balancing reasons it would be better to spread the tasks across those two Task Managers more evenly).
 
No, Flink doesn't hold any resources (appart of network buffers) per task. All of the available memory and CPU resources are shared across all of the running tasks. So in the (1-2-1-1-1) case, if the first task manager will be overloaded (for example if it has very few CPU cores), the second task will perform much better on the second task manager (which will be empty), causing a throughput skew. From this perspective, (2-2-2-2-2) would most likely be performing better, as the load would be more evenly spread.  
 
Piotrek 
 
niedz., 28 lut 2021 o 13:10 Jan Nitschke <[hidden email]> napisał(a):
Hello, 
 
We are working on a project where we want to gather information about the job performance across different task level parallelism settings.
Essentially, we want to see how the throughput of a single task varies across different parallelism settings, e.g. for a job of 5 tasks: 1-1-1-1-1 vs. 1-2-1-1-1 vs. 2-2-2-2-2. 
 
We are running flink on Kubernetes, a job with 5 tasks, slot sharing is enabled, operator chasing is disabled and each task manager has one slot.
 
So, the number of task managers is always the number of the highest parallelism and wen can fit the entire job into one task manager slot. 
 
We are then running the job against multiple parallelism configs (such as those above), collect the relevant metrics and try to get some useful information out of them. 
 
We are now wondering how independent our results are from one another. More specifically, if we now look at the parallelism of the second task, is its performance independent of the parallelism of the other tasks? So, will a the second task perform the same in (1-2-1-1-1) as in (2-2-2-2-2)? 
 
Our take on it is the following: With our setup, (1-2-1-1-1) should result in one task manager holding the entire job and a second task manager that only runs the second task. (2-2-2-2-2) will run two task managers with the entire job. So, theoretically, the second task should have much more resources available in the first setup as it has the entire resources of that task manager to its disposal. Does that assumption hold or will flink assign a certain amount of resources to a task in a task manager no matter how many other tasks are running on that same task manager slot? 
 
We would highly appreciate any help. 
 